다발무 1998년 12월 가격 결과

  • 날짜
    기준단위
    등급
    평균가(시세)
  • 1998/12/19
    5 톤트럭
    1,500,000
  • 1998/12/19
    5 톤트럭
    1,000,000
  • 1998/12/19
    5 톤트럭
    650,000
  • 1998/12/18
    5 톤트럭
    1,200,000
  • 1998/12/18
    5 톤트럭
    1,000,000
  • 1998/12/18
    5 톤트럭
    750,000
  • 1998/12/17
    5 톤트럭
    1,200,000
  • 1998/12/17
    5 톤트럭
    1,000,000
  • 1998/12/17
    5 톤트럭
    750,000
  • 1998/12/16
    5 톤트럭
    1,650,000
  • 1998/12/16
    5 톤트럭
    1,350,000
  • 1998/12/16
    5 톤트럭
    1,050,000
  • 1998/12/15
    5 톤트럭
    1,650,000
  • 1998/12/15
    5 톤트럭
    1,350,000
  • 1998/12/15
    5 톤트럭
    1,050,000
  • 1998/12/14
    5 톤트럭
    1,500,000
  • 1998/12/14
    5 톤트럭
    1,100,000
  • 1998/12/14
    5 톤트럭
    700,000
  • 1998/12/12
    5 톤트럭
    1,400,000
  • 1998/12/12
    5 톤트럭
    1,100,000
  • 1998/12/12
    5 톤트럭
    750,000
  • 1998/12/11
    5 톤트럭
    1,500,000
  • 1998/12/11
    5 톤트럭
    1,150,000
  • 1998/12/11
    5 톤트럭
    800,000
  • 1998/12/10
    5 톤트럭
    1,450,000
  • 1998/12/10
    5 톤트럭
    1,150,000
  • 1998/12/10
    5 톤트럭
    800,000
  • 1998/12/9
    5 톤트럭
    1,700,000
  • 1998/12/9
    5 톤트럭
    1,250,000
  • 1998/12/9
    5 톤트럭
    800,000
  • 1998/12/8
    5 톤트럭
    1,750,000
  • 1998/12/8
    5 톤트럭
    1,250,000
  • 1998/12/8
    5 톤트럭
    800,000
  • 1998/12/7
    5 톤트럭
    1,850,000
  • 1998/12/7
    5 톤트럭
    1,250,000
  • 1998/12/7
    5 톤트럭
    750,000
  • 1998/12/5
    5 톤트럭
    1,500,000
  • 1998/12/5
    5 톤트럭
    1,100,000
  • 1998/12/5
    5 톤트럭
    700,000
  • 1998/12/4
    5 톤트럭
    1,400,000
  • 1998/12/4
    5 톤트럭
    1,000,000
  • 1998/12/4
    5 톤트럭
    650,000
  • 1998/12/3
    5 톤트럭
    1,350,000
  • 1998/12/3
    5 톤트럭
    1,050,000
  • 1998/12/3
    5 톤트럭
    750,000
  • 1998/12/2
    5 톤트럭
    1,700,000
  • 1998/12/2
    5 톤트럭
    1,200,000
  • 1998/12/2
    5 톤트럭
    800,000
  • 1998/12/1
    5 톤트럭
    1,400,000
  • 1998/12/1
    5 톤트럭
    1,200,000
  • 1998/12/1
    5 톤트럭
    950,000

다발무 1998년 11월 가격 결과

  • 날짜
    기준단위
    등급
    평균가(시세)
  • 1998/11/30
    5 톤트럭
    1,800,000
  • 1998/11/30
    5 톤트럭
    1,450,000
  • 1998/11/30
    5 톤트럭
    1,150,000
  • 1998/11/28
    5 톤트럭
    1,800,000
  • 1998/11/28
    5 톤트럭
    1,450,000
  • 1998/11/28
    5 톤트럭
    1,150,000
  • 1998/11/27
    5 톤트럭
    1,450,000
  • 1998/11/27
    5 톤트럭
    1,100,000
  • 1998/11/27
    5 톤트럭
    750,000
  • 1998/11/26
    5 톤트럭
    1,350,000
  • 1998/11/26
    5 톤트럭
    1,050,000
  • 1998/11/26
    5 톤트럭
    750,000
  • 1998/11/24
    5 톤트럭
    1,650,000
  • 1998/11/24
    5 톤트럭
    1,350,000
  • 1998/11/24
    5 톤트럭
    1,000,000
  • 1998/11/23
    5 톤트럭
    2,000,000
  • 1998/11/23
    5 톤트럭
    1,600,000
  • 1998/11/23
    5 톤트럭
    1,200,000
  • 1998/11/21
    5 톤트럭
    1,300,000
  • 1998/11/21
    5 톤트럭
    950,000
  • 1998/11/21
    5 톤트럭
    650,000
  • 1998/11/20
    5 톤트럭
    1,400,000
  • 1998/11/20
    5 톤트럭
    1,050,000
  • 1998/11/20
    5 톤트럭
    750,000
  • 1998/11/19
    5 톤트럭
    1,400,000
  • 1998/11/19
    5 톤트럭
    1,000,000
  • 1998/11/19
    5 톤트럭
    600,000
  • 1998/11/18
    5 톤트럭
    1,600,000
  • 1998/11/18
    5 톤트럭
    1,200,000
  • 1998/11/18
    5 톤트럭
    750,000
  • 1998/11/17
    5 톤트럭
    1,750,000
  • 1998/11/17
    5 톤트럭
    1,250,000
  • 1998/11/17
    5 톤트럭
    750,000
  • 1998/11/16
    5 톤트럭
    1,750,000
  • 1998/11/16
    5 톤트럭
    1,300,000
  • 1998/11/16
    5 톤트럭
    900,000
  • 1998/11/14
    5 톤트럭
    1,425,000
  • 1998/11/14
    5 톤트럭
    1,150,000
  • 1998/11/14
    5 톤트럭
    800,000
  • 1998/11/13
    5 톤트럭
    1,500,000
  • 1998/11/13
    5 톤트럭
    1,100,000
  • 1998/11/13
    5 톤트럭
    700,000
  • 1998/11/12
    5 톤트럭
    1,600,000
  • 1998/11/12
    5 톤트럭
    1,200,000
  • 1998/11/12
    5 톤트럭
    850,000
  • 1998/11/11
    5 톤트럭
    1,800,000
  • 1998/11/11
    5 톤트럭
    1,400,000
  • 1998/11/11
    5 톤트럭
    1,000,000
  • 1998/11/10
    5 톤트럭
    1,500,000
  • 1998/11/10
    5 톤트럭
    1,150,000
  • 1998/11/10
    5 톤트럭
    800,000
  • 1998/11/9
    5 톤트럭
    1,650,000
  • 1998/11/9
    5 톤트럭
    1,200,000
  • 1998/11/9
    5 톤트럭
    800,000
  • 1998/11/7
    5 톤트럭
    1,600,000
  • 1998/11/7
    5 톤트럭
    1,250,000
  • 1998/11/7
    5 톤트럭
    900,000
  • 1998/11/6
    5 톤트럭
    2,200,000
  • 1998/11/6
    5 톤트럭
    1,500,000
  • 1998/11/6
    5 톤트럭
    1,000,000
  • 1998/11/5
    5 톤트럭
    2,150,000
  • 1998/11/5
    5 톤트럭
    1,500,000
  • 1998/11/5
    5 톤트럭
    1,000,000
  • 1998/11/4
    5 톤트럭
    2,000,000
  • 1998/11/4
    5 톤트럭
    1,500,000
  • 1998/11/4
    5 톤트럭
    1,000,000
  • 1998/11/3
    5 톤트럭
    2,100,000
  • 1998/11/3
    5 톤트럭
    1,600,000
  • 1998/11/3
    5 톤트럭
    1,000,000
  • 1998/11/2
    5 톤트럭
    2,150,000
  • 1998/11/2
    5 톤트럭
    1,700,000
  • 1998/11/2
    5 톤트럭
    1,100,000

다발무 1998년 10월 가격 결과

  • 날짜
    기준단위
    등급
    평균가(시세)
  • 1998/10/31
    5 톤트럭
    2,250,000
  • 1998/10/31
    5 톤트럭
    1,700,000
  • 1998/10/31
    5 톤트럭
    1,100,000
  • 1998/10/30
    5 톤트럭
    2,250,000
  • 1998/10/30
    5 톤트럭
    1,750,000
  • 1998/10/30
    5 톤트럭
    1,250,000
  • 1998/10/29
    5 톤트럭
    2,100,000
  • 1998/10/29
    5 톤트럭
    1,500,000
  • 1998/10/29
    5 톤트럭
    900,000
  • 1998/10/28
    5 톤트럭
    2,000,000
  • 1998/10/28
    5 톤트럭
    1,500,000
  • 1998/10/28
    5 톤트럭
    1,000,000
  • 1998/10/27
    5 톤트럭
    2,600,000
  • 1998/10/27
    5 톤트럭
    1,900,000
  • 1998/10/27
    5 톤트럭
    1,200,000
  • 1998/10/26
    5 톤트럭
    2,600,000
  • 1998/10/26
    5 톤트럭
    1,900,000
  • 1998/10/26
    5 톤트럭
    1,300,000
  • 1998/10/24
    5 톤트럭
    2,500,000
  • 1998/10/24
    5 톤트럭
    2,000,000
  • 1998/10/24
    5 톤트럭
    1,500,000
  • 1998/10/23
    5 톤트럭
    2,500,000
  • 1998/10/23
    5 톤트럭
    2,000,000
  • 1998/10/23
    5 톤트럭
    1,600,000
  • 1998/10/22
    5 톤트럭
    2,750,000
  • 1998/10/22
    5 톤트럭
    2,250,000
  • 1998/10/22
    5 톤트럭
    1,750,000